Dave's F-32AX Trimaran
Building a f-32 trimaran
Thursday, August 30, 2012
All hulls meet !
July 29 main hull is put on new trailer and set up for the joining of the floats.
Aug. 8 the beams and folding system are assembled and the floats attached.
Aug. 27 the windows are installed.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)